排水渠模具的作用是在水利工程建设的时候用到的,而排水渠主要以矩形以及梯形的为主,通过对图纸的分析,可以确定使用何种材质的模具生产,比如整体结构的需要采用排水槽钢模具,而拼接形式的,用排水渠模具即可完成生产。所以客户在选择购买模具的时候,需要有明确的图纸提示才可以。排水渠模具从总体上来看一般属于U型槽钢模具,外形酷似U型,但是也有细微的差别,有的原U型的,有的平U型的,还有的是U型带造型的,很多很多,只是使用的地点不同,排水沟钢模具总得来说作用就是为了排水使用,有用在农田灌溉的,水流湍急地带的,池塘的,电缆沟的等等,总之,任何U型沟模具我们都可以定做
The role of the drainage channel mold is used in the water conservancy project construction, and the drainage channel is mainly rectangular and trapezoidal. Through the analysis of the drawings, we can determine what kind of material mold to use. For example, the overall structure needs to use the drainage channel steel mold, while the splicing form, the drainage channel mold can complete the production. Therefore, when customers choose to purchase molds, they need to have clear drawing tips. Generally speaking, the drainage channel mold generally belongs to the U-shaped channel steel mold, which is similar to the U-shaped shape, but there are also subtle differences. Some are original U-shaped, some are flat U-shaped, and some are U-shaped, many of which are only used in different places. The function of the drainage channel steel mold is to drain water, which is used in farmland irrigation, in the area of turbulent water flow and ponds In a word, any U-groove mold can be customized
组装排水渠模具的时候需要检查好每一个使用到的螺栓与卡扣,螺栓都是会根据就模具的型号大小进行使用,并且螺栓也需要和模具一样,在不使用到的时候涂刷上防锈油存放。组装的时候要将模具接口对准,使用卡扣固定整齐后,用电动扳手将螺栓一个一个的组装在上面,如果螺栓出现生锈或者是泥浆粘连的问题也是需要仔细清理干净的,拼接好的模具先检查有没有缝隙或者是遗漏的位置,接下来便是涂刷脱模剂注入泥浆了,凝固后立即拆模,取下固定模具的螺栓,排水渠模具拆开后就可以了仔细检查有没有粘连到大量的泥浆,不能够使用外力强行拆模,也要避免尖锐物品剐蹭模具。
When assembling the drainage channel mold, it is necessary to check every bolt and clasp used. The bolts will be used according to the model size of the mold, and the bolts should be coated with antirust oil when not in use. When assembling, the mold interface should be aligned. After the snap is used to fix the bolts orderly, the electric wrench is used to assemble the bolts one by one. If the bolts rust or the slurry adhesion problem occurs, it is also necessary to clean them carefully. The spliced mold should first check whether there is any gap or missing position, and then brush the mold release agent, inject the mud, and then erect it after solidification That is to remove the mold, take down the bolts that fix the mold, and after the mold of the drainage channel is disassembled, carefully check whether there is a large amount of mud adhered. Do not use external force to forcibly remove the mold, but also avoid sharp objects scratching the mold.